The history of the company
The history of the company Ukrburservice began in 2003 with the engineering and technical support of wells in the Kharkov region. Successful implementation of this and several subsequent projects allowed us to purchase a Uralmash 3D-74 drilling rig, to form a highly qualified drilling team and begin construction of a manufacturing capabilities as well as additional production facilities.
The first well realized by our own drilling team was the well #21 of the Maryinsky field. In 2011, a NOV drilling rig with a capacity of 400 tons was purchased and equipped with the top drive PTD-500 AC system from Aker MH AS, which allowed us to significantly reduce the time required to construct wells with a depth of over 5300 meters. Later, our technical park was supplemented with the SL2500T-AC-W bench (load capacity 650 tons), which was tested by manufacturer and is already available for work.
Since 2003, Ukrburservis has been working in 4 regions of Ukraine. More than 48 wells were drilled with the total penetration more than 168 thousand meters. At the same time, the rate of penetration only doubled in 2016 (from … thousand meters to … thousand meters). This became possible due to the latest equipment, well-coordinated work of the drilling teams and is an evidence of the high efficiency of our company.